Construction site building

Homes built in the right order.

( Majboot )Independent houses, extra floors, shops and small commercial buildings, built on contract by our own crew across Ahmedabad and Gandhinagar.

Sixty builders, one site at a time.

01( Practice )We are a building contractor with our own masons, bar benders, electricians and plumbers. We quote from a measured survey and a BOQ, and build to the approved drawings.

  • Registered contractor, insured on every site
  • Most houses take eight to fourteen months
  • Building in Ahmedabad since 2005

Five kinds of job, one way of working

02( Services )We only take on what our own crew can build and stand behind.

House construction Building construction floor Commercial building construction House renovation Concrete pouring

A fixed price, from a measured survey.

03( Survey )Before we quote, our engineer and estimator spend half a day on the plot or in the house. The price comes from what they measure, not from a rate card.

Width 30′ 0″
Depth 40′ 0″
Construction engineer site
( 30 × 40 plot, Saravanampatti — the day of the survey )
  1. 01( Measure )

    Every boundary, level and existing wall, drawn and sent to you as a PDF.

  2. 02( Test )

    Soil test for new houses, and a structural check before any extra floor.

  3. 03( Price )

    A BOQ with quantities and rates, valid for sixty days. Changes are priced before they are built.

  4. 04( Cost )

    The survey costs ₹5,000 and comes off the job if you build with us.

Homes we handed over

04( Work )Twelve rooms from the last eighteen months, photographed on handover day.

  • Building construction scaffolding
    Living room — Saravanampatti
  • House construction roof
    Hall and doors — RS Puram
  • House construction
    Kitchen window — Naroda
  • Concrete column construction
    Kitchen and dining — Vadavalli
  • House construction
    Kitchen — Ganapathy
  • House construction
    Bathroom — Race Course
  • Brick wall construction
    Bathroom — Nikol
  • House construction
    Dining room — Singanallur
  • House construction
    Ground floor — Kovaipudur
  • New house construction
    Living room — Thudiyalur
  • House construction
    Stair — Kalapatti
  • Residential building construction
    Top floor — Gandhinagar

Five materials we keep coming back to

05( Materials )A small list on purpose: fewer suppliers, fewer surprises, and materials our crew knows how to use well.

Built in the order a house is built

06( Order of work )Every job runs the same five stages. You get photos at the end of each one, and you pay only when it is done.

  1. 01

    Survey

    Measured drawings, soil test, one BOQ.

    Month 0

  2. 02

    Foundation

    Excavation, footings and plinth beam, checked by the engineer.

    Month 1

  3. 03

    Structure

    Columns, slabs and walls, with curing done properly every day.

    Months 2–5

  4. 04

    Services

    Wiring, plumbing and drainage, tested before plastering.

    Months 5–7

  5. 05

    Finish

    Plaster, floors, doors and paint, then a snag list closed before the last bill.

    Months 7–10

Fixed

07( Promise )Three things we put in writing and sign before work starts.

  • Fixed price

    The number on your BOQ is the number on the last bill, unless you change the plan.

  • Fixed date

    You get a handover date before we start. If we miss it, we pay you ₹2,000 for every working day.

  • Ten years

    Structure and waterproofing carry a ten-year warranty written into your contract, and it moves with the house if you sell.

The people who quote are the people on site

08( Crew )Sixty of us, all on our rolls. No labour contractors on the structure.

What people say after handover

09( Reviews )Four clients from the last two years, in their own words.

Before you call

10( Questions )The six things people ask us first.

( Area )Where do you build?

Ahmedabad, Gandhinagar and towns within sixty kilometres. For larger buildings, across north Gujarat.

( Size )What is the smallest job you take?

A bathroom renovation. We do not take small repairs; we are not set up to do them well.

( Approvals )Who gets the building approval?

Our architect prepares the drawings and we follow the approval with the local body until it is issued.

( Living in )Can we stay in the house during renovation?

Usually yes. We close off the work area and leave one bathroom working every day.

( Payment )How do payments work?

A ten percent advance, then a payment as each stage is finished and checked. Never ahead of the work.

( Start )How soon can you start?

Surveys within a week of your call. Building usually starts four to six weeks after you sign.

Book a site visit

11( Visit )Tell us about the plot or the house and we will call to fix a time.

Office
14, Naroda Road, Ahmedabad 382330
Phone
+91 00000 00000
Email
build@buildwell.example
Hours
Monday to Saturday, 8:00–18:00. Sunday site visits on request.
Building under construction

Demo design. The business, people and numbers are examples; yours replace them. All designs Build your website