Homes built in the right order.
( Majboot )Independent houses, extra floors, shops and small commercial buildings, built on contract by our own crew across Ahmedabad and Gandhinagar.
Sixty builders, one site at a time.
01( Practice )We are a building contractor with our own masons, bar benders, electricians and plumbers. We quote from a measured survey and a BOQ, and build to the approved drawings.
- Registered contractor, insured on every site
- Most houses take eight to fourteen months
- Building in Ahmedabad since 2005
Five kinds of job, one way of working
02( Services )We only take on what our own crew can build and stand behind.
-
House construction
Independent houses from foundation to keys, to the approved plan and structural drawings.
-
Extra floors
A new floor on an existing house, after the structure is checked by our engineer.
-
Commercial buildings
Shops, clinics and small offices with columns sized for the load.
-
Renovation
Kitchens, bathrooms and full-house repairs, done while the family stays in the house.
-
Waterproofing and repair
Terraces, bathrooms and walls that leak, fixed and tested by flooding.
A fixed price, from a measured survey.
03( Survey )Before we quote, our engineer and estimator spend half a day on the plot or in the house. The price comes from what they measure, not from a rate card.

01( Measure )
Every boundary, level and existing wall, drawn and sent to you as a PDF.
02( Test )
Soil test for new houses, and a structural check before any extra floor.
03( Price )
A BOQ with quantities and rates, valid for sixty days. Changes are priced before they are built.
04( Cost )
The survey costs ₹5,000 and comes off the job if you build with us.
Homes we handed over
04( Work )Twelve rooms from the last eighteen months, photographed on handover day.

Living room — Saravanampatti 
Hall and doors — RS Puram 
Kitchen window — Naroda 
Kitchen and dining — Vadavalli 
Kitchen — Ganapathy 
Bathroom — Race Course 
Bathroom — Nikol 
Dining room — Singanallur 
Ground floor — Kovaipudur 
Living room — Thudiyalur 
Stair — Kalapatti 
Top floor — Gandhinagar
Five materials we keep coming back to
05( Materials )A small list on purpose: fewer suppliers, fewer surprises, and materials our crew knows how to use well.

Lime plaster
Inside walls in old houses. It breathes, so damp can leave.

Teak wood
Main doors and window frames, oiled not painted, so a scratch sands out.

Granite
Kitchen platforms, steps and sills that outlast the house.

Kota stone
Sit-outs, balconies and yard steps that take the rain.

TMT steel
Branded bars for every column and slab, with the test certificate on file.
Built in the order a house is built
06( Order of work )Every job runs the same five stages. You get photos at the end of each one, and you pay only when it is done.
- 01
Survey
Measured drawings, soil test, one BOQ.
Month 0
- 02
Foundation
Excavation, footings and plinth beam, checked by the engineer.
Month 1
- 03
Structure
Columns, slabs and walls, with curing done properly every day.
Months 2–5
- 04
Services
Wiring, plumbing and drainage, tested before plastering.
Months 5–7
- 05
Finish
Plaster, floors, doors and paint, then a snag list closed before the last bill.
Months 7–10
Fixed
07( Promise )Three things we put in writing and sign before work starts.
Fixed price
The number on your BOQ is the number on the last bill, unless you change the plan.
Fixed date
You get a handover date before we start. If we miss it, we pay you ₹2,000 for every working day.
Ten years
Structure and waterproofing carry a ten-year warranty written into your contract, and it moves with the house if you sell.
The people who quote are the people on site
08( Crew )Sixty of us, all on our rolls. No labour contractors on the structure.

Murugan K.Site lead · 18 years 
Divya R.Engineer and estimator · 9 years 
Senthil V.Electrician · 12 years 
Arun P.Plumber · 8 years 
Rajan S.Head mason · 24 years
What people say after handover
09( Reviews )Four clients from the last two years, in their own words.
“They told us the month the slab would be cast, and that is the month it was cast. Nobody had ever done that for us.”
Priya and KarthikNew house · Saravanampatti · 2025
“Murugan answered every call, even on Sundays. The snag list had four items and they were gone in two days.”
Lakshmi NarayananExtra floor · RS Puram · 2025
“They kept our grandfather's teak doors and fitted them in the new house.”
Ramesh IyerRebuild · Race Course · 2024
“The final bill matched the BOQ to the rupee. I checked it twice.”
Dr. Meena S.Clinic building · Ganapathy · 2025
Before you call
10( Questions )The six things people ask us first.
( Area )Where do you build?
Ahmedabad, Gandhinagar and towns within sixty kilometres. For larger buildings, across north Gujarat.
( Size )What is the smallest job you take?
A bathroom renovation. We do not take small repairs; we are not set up to do them well.
( Approvals )Who gets the building approval?
Our architect prepares the drawings and we follow the approval with the local body until it is issued.
( Living in )Can we stay in the house during renovation?
Usually yes. We close off the work area and leave one bathroom working every day.
( Payment )How do payments work?
A ten percent advance, then a payment as each stage is finished and checked. Never ahead of the work.
( Start )How soon can you start?
Surveys within a week of your call. Building usually starts four to six weeks after you sign.
Book a site visit
11( Visit )Tell us about the plot or the house and we will call to fix a time.
- Office
- 14, Naroda Road, Ahmedabad 382330
- Phone
- +91 00000 00000
- build@buildwell.example
- Hours
- Monday to Saturday, 8:00–18:00. Sunday site visits on request.